![lumen christi mequon wi lumen christi mequon wi](https://www.prarch.com/wp-content/uploads/2020/12/Lumen-Christi-Catholic-Church-Exterior-and-Entrance.jpg)
nave, the altar was reoriented and expanded, new stained glass windows were custom designed to accentuate the altar, the choir space was expanded, new pews were installed, and other finishes and lighting upgrades were incorporated.
![lumen christi mequon wi lumen christi mequon wi](https://cameralovephotography.files.wordpress.com/2009/09/sdl_9718.jpg)
The team also created a narthex to promote fellowship before and after worship and acts as an overflow seating area for larger Masses. The second phase of work at Lumen Christi included PRA designing a new entrance, bell tower, and sanctuary that the parishioners will use to worship in for years to come. At the front of the building, a secure entrance was added, ensuring the safety of the building users. Areas of the existing school building were renovated to create larger classrooms to support a modern learning environment. A science classroom, library, and other support spaces were also provided to serve the combined school. precast gymnasium addition was constructed, along with a new gym entrance and lobby, restrooms, and locker rooms. The existing K-8 school was too small to support the combined student population, resulting in new spaces. floor level was converted into a large multi-purpose room, kitchenette, liturgy room, restrooms, and storage. Above this renovated space, the 8,600 sq. The existing gymnasium was renovated to house the combined parish’s administration offices and several conference rooms. The first phase of work at Lumen Christi included blending two existing parishes into one cohesive worship and learning facility in Mequon, WI.